
The line of groundwater remediation equipment, soil vapor extraction equipment and packaged treatment systems include oil water separators, diffused air strippers, counterflow plate strippers, heavy metal removal filters, and multiphase extractors.
Heavy Metals RemovalThis line of heavy metals removal systems are for trace metal removal including arsenic, lead, copper, zinc, cadmium, chromium, nickel, iron and manganese.
Special media removes only the heavy metals while non-polluting constituents pass to the sewer. The selectivity of the media enables extended operation between changeouts so very little operator attention is required.
Complete, skid-mounted systems arrive ready for immediate use. Heavy metal removal systems are available for flow rates up to 200 GPM. Effluent levels of heavy metals can often be reduced to low ppb concentrations.
Oil Water SeparatorsThe oil water separators are suitable for continuous flow operation. Dual hydropaks permit removal of coalescing media for cleaning while the system continues to operate. Cleaning is easy due to the design of the piping on the sides of the unit. This allows the cover to be removed permitting easy access to the components.
The inlet header releases entrained air so flow patterns are not disturbed. Free product is effectively separated down to 10 ppm droplets greater than 20 microns. Separator sizes range up to 100 GPM.

Air StrippersThis low profile Diffused Aeration air stripper provides up to 99.99% removal of VOC compounds.
It is particularly resistant to iron fouling problems yet very easy to clean. Flows to 50 GPM.
The Counterflow Plate Stripper is for higher flows or more difficult stripping operations.
It provides easy access to aeration plates without disassembly for cleaning. Flow rates to 150 GPM.
Complete Packaged SystemsComplete remediation systems for soil and groundwater treatment are available in housings, trailers or skid mounted. Systems are pre-piped, pre-wired and factory tested to minimize field start-up and operational problems.

The Texas Commission on Environmental Quality (TCEQ) has approximately 3,000 employees, 16 regional offices, and a $463.9 million budget.
The Environmental Protection Agency (EPA) employs 18,000 people across the US, with HQ in DC, 10 regional offices, and more than a dozen labs. The EPA Administrator is appointed by the President of the US and has a budget of $7.6 billion.
Check our environmental page for equipment that will help your company remain in compliance.